Skip to content
Process

Why Kickoff Isn’t Enough (and How to Fix It Mid-Project)

A strong kickoff won’t guarantee project success. Discover why midpoint check-ins are essential to realign goals, resolve blockers, and maintain momentum.

Sometimes teams begin projects on the right foot: aligned goals, a clear brief, and plenty of energy. But somewhere around the halfway mark, things often start to unravel.

That’s because the kickoff alone isn’t enough.

Without a deliberate midpoint check-in, projects risk:

  1. Missing deadlines that no one calls out

  2. Losing stakeholders to other priorities

  3. Stalling tasks due to unresolved blockers

  4. Drifting momentum even as everyone stays “busy”

  5. Fragmented feedback and approvals scattered across emails, chats and tools

The kickoff sets the direction. The midpoint check-in keeps you on the path.


What to Cover in a Midpoint Check-in

This isn’t just a glorified status update. It’s a chance to recalibrate the project while there’s still time to fix what’s not working.

Focus on:

  1. Progress Check – What’s complete, what’s behind, what’s next?

  2. Resources – Who’s overloaded, who has capacity?

  3. Stakeholder Feedback – Are approvals coming through or stuck in inboxes? Have priorities shifted?

  4. Risks & Blockers – What could derail progress, and how can we prevent it?

  5. Alignment – Are we still delivering the right thing, for the right reason?

  6. Tool Consistency - Is feedback and approval work centralized or are decisions scattered across Slack, email and shared docs? (If it's the latter, this is the moment to reset expectations and bring everything back into your project management system.)

A midpoint is about course correction, not just reporting status.


💡 Pro Move: Centralize Feedback

One of the biggest reasons projects un ravel at the midpoint isn't missed deadlines, it's scattered approvals. Feedback lives in email, edits happen in shared docs and stakeholder comments trickle into chat threads. 

By the time you reach the halfway point, no one knows which version is "final". 

👉 Use the midpoint check-in to reset expectations:

  1. Pick one system of record (your PM tool, or a designated feedback tracker).

  2. Set approval deadlines and tie them to milestones.

  3. Assign a single owner for collecting, consolidating, and clarifying feedback.

This reduces decision churn and ensures approvals don’t become silent project killers.


A Simple Agenda for your Midpoint Check-in

The good news: it doesn’t have to take long. With structure, you can reset a project in 30 minutes.

  1. Revisit the goal. Ground the team in the “why.”

  2. Walk through progress. What’s done vs. behind (use your PM tool for clarity).

  3. Identify blockers. Surface and assign next steps.

  4. Talk resources. Any absences, role shifts, or conflicts?

  5. Reconfirm milestones. Reset timelines if needed.

  6. Assign follow-ups. Clarify owners and update the plan.

  7. Unify feedback loops - Recommit to one workflow for approvals, so nothing slips through the cracks.

🔁 Always follow with a short written recap because clarity and momentum often come from documentation.


Final Thought

Project management isn’t just about starting strong. It’s about knowing when to pause, reset, and realign. A structured midpoint check-in is the difference between projects that stumble across the finish line and projects that deliver with confidence.

If your team has been scattering decisions across too many channels, use the midpoint as your chance to get everyone back into one source of truth. 

Manage it Pros

Manage it Pros is on a mission is to help companies foster cultures of collaboration, innovation, and excellence by building better workflows and processes while adapting seamlessly to different teams, personalities, and clients. By prioritizing adaptability, empathy, and inclusivity, we enable teams to thrive and achieve extraordinary results that allow them to work better, together.

Newsletter CTA (1)

Subscribe to our newsletter

Latest Articles

Why Kickoff Isn’t Enough (and How to Fix It Mid-Project)

Why Kickoff Isn’t Enough (and How to Fix It Mid-Project)

A strong kickoff won’t guarantee project success. Discover why midpoint check-ins are essential to realign goals, resolve blockers, and mai...

Small Workflow Fixes That Make a Big Impact

Small Workflow Fixes That Make a Big Impact

The best workflow improvements aren’t always big overhauls. Discover 6 small but powerful process fixes that reduce chaos, support your tea...

5 Common Workflow Problems That Derail Creative Teams (and How to Fix Them)

5 Common Workflow Problems That Derail Creative Teams (and How to Fix Them)

Discover the top 5 workflow issues that slow down creative and marketing teams—and how to fix them. From messy intake to meeting overload, ...